CMS Landscape Services


Go to content

Sheerwater Crescent

Portfolio > Landscaping

Portfolio
Sheerwater Crescent

Description
Spring 2010
Replace the rear patio and steps.

Project Brief
Lift and remove old slaps exstend add a small raised wall, remove soil foundations of old slads replave with a layer of road stone and lay new slabs.
Brake Down Of Procedure

  • Starting off by removing all all slabs.
  • dig down 100m and remove soil
  • Dig trench ans fill with concrete for small wall and built it.
  • lay membrane and infill with road stone.
  • Replace old manhole cover with an infill matching slads
  • Lay Slabs on a full bed of sand and cement and pointed with sand and cement same the steps.
  • Site swept and cleaned to give the finished project.

Back to content | Back to main menu