Description
Summer 2009
A project that became too big for a couple of determined Gardeners
Project Brief
To increase the patio area and make a set of safe steps to the lawn. Overall giving the garden a modern felling.
Brake Down Of Procedure
- Starting off by hand digging and removing 22 tons of soil and 3 tons of rubble to achieve the shape of new area.
- Trenches dug and filled with concrete and block walls and steps built.
- New area filled and levelled with road stone to give a suitable slab laying suffice
- Slabs Laded on a full bed of sand and cement and pointed with sand and cement
- block walls and steps were cladded and half round poles screwed to give a wooden poled wall
- Site swept and cleaned to give the Finished project.